What We Do

Services

Everything from a first-time deck build to fixing what another contractor left behind.

Home › Services

Everything we take on

Every job below is one we do ourselves across Goodyear.

Deck Installation

We dig footings below grade and set posts in concrete, sized to the beam spans your local building department requires. Ledger boards get flashed and bolted to the house framing, not just lagged into stucco, so the deck doesn't pull away after the first monsoon season.

Custom Deck Design

We draw out the layout before any lumber gets ordered, working around existing doors, pool equipment, and whatever shade your yard actually has at 4pm in July. Stairs, built-in seating, multiple levels, we figure out the framing for all of it on paper first.

Composite Decking Installation

Composite boards don't warp or splinter like pressure-treated pine does after a few Arizona summers, but they still need the right joist spacing underneath or they'll bounce. We install hidden fastener systems so the surface has no visible screw heads.

Deck Staining & Sealing

Wood decking out here takes a beating from UV, not moisture, so we use stains rated for high sun exposure rather than products made for wetter climates. We pressure wash, let the boards dry fully, then seal, because sealing over trapped moisture just blisters.

Deck Repair

Loose railings, sagging boards, and posts that have started to rot where they meet the concrete footing, that's most of what we get called out for. We replace the bad lumber and check the framing underneath before we touch anything cosmetic.

Deck Railing Installation & Repair

Code calls for 36 inches minimum on most residential railings with balusters spaced so a 4 inch sphere can't pass through, and we build to that whether it's wood, cable, or metal. Loose rail posts almost always trace back to a lag bolt that never hit solid blocking.

Deck Resurfacing & Board Replacement

If the frame underneath is still sound, we pull the old decking and replace just the boards instead of tearing the whole structure down. It's a faster way to get a deck looking new without rebuilding what's still doing its job.

Deck Demolition & Removal

Old decks get torn out board by board, and we check what's underneath before anything new goes up, since that's usually where rot or termite damage hides. We haul everything off, including old concrete footings that sit in the wrong spot for a new layout.

Pergolas & Shade Structures

A deck with no shade is unusable by June around here, so a lot of our deck jobs turn into pergola jobs too. We frame them to carry the load of shade cloth, polycarbonate panels, or climbing plants, whatever you're planning to put on top.

Multi-Level & Elevated Deck Building

Elevated decks need engineered beams and proper post footings, especially off a sloped yard or a second-story door. We size the structure to the load and get it inspected, not just built to look right from the ground.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Goodyear, AZ

Deck building and repair available throughout the Goodyear area and beyond.

Goodyear, AZ
Phoenix, AZ
Mesa, AZ
Chandler, AZ
Glendale, AZ
Scottsdale, AZ
Gilbert, AZ
Tempe, AZ
Peoria, AZ
Surprise, AZ
Avondale, AZ
Buckeye, AZ
Common Questions

Things worth asking

Questions that come up once a project actually gets started.

Do I need a permit to build a deck in Goodyear?
Most elevated or structurally attached decks in Goodyear require a building permit, especially anything over 30 inches off grade or attached to the house. Smaller freestanding, ground-level decks sometimes qualify for exemptions, which gets confirmed with the local building department before work starts.
How long does it take to build a deck?
A standard ground-level deck around 300 to 400 square feet typically takes one to two weeks from footings to final board. Elevated multi-level decks or anything with custom railing or built-ins can run three to four weeks depending on complexity.
Can a deck be built to fit a specific budget?
Square footage, decking material, and railing style can all be adjusted to hit a target budget. Pressure-treated pine with a standard rail sits at the lower end, and composite decking with cable or glass rail sits at the higher end.
What kind of guarantee comes with a new deck?
Workmanship on new deck construction and repairs is covered by warranty, and manufacturer warranties on composite decking or hardware are passed through directly. Specific warranty terms are laid out in writing in the quote.
Who do I talk to day to day during the project?
A single point of contact handles scheduling, material questions, and any changes during a deck project rather than passing you between different people. That's usually whoever came out for the initial estimate.
What decking materials do you work with?
Pressure-treated pine, cedar, and composite brands including Trex and TimberTech are all standard options for deck construction. Pine costs less upfront but requires resealing every couple of years in Arizona sun, while composite costs more initially but stays low-maintenance after that.
Can I still use my yard or house while the deck is being built?
Normal household access isn't affected during deck construction, though the immediate work area around the deck footprint gets closed off for safety. Pools or patios near the build zone may have limited access on pour or framing days.
What do I need to do to the site before work starts?
Clearing furniture, grills, and potted plants off the existing deck or build area makes the first day go faster. Anything underground in that footprint, like irrigation lines or low-voltage lighting wire, should be flagged ahead of time so footings don't land on top of it.
What happens if you find rot or a problem once the old deck is torn out?
If rot, termite damage, or a failing ledger board attachment turns up once old decking comes off, it gets flagged and priced as a change order before continuing. That's more common on repair and resurfacing jobs than brand new builds, where there's nothing old to uncover.
How do I take care of a new deck once it's finished?
Wood decking should be resealed every one to two years in Arizona's sun, with more frequent attention on south and west-facing sections. Composite decking just requires periodic washing to clear dust and debris, with no sealing or staining required.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (928) 843-0632